Skip to content
All services

Discovery Sprint

Usually the first step

Know what to build before you spend on building it.

You have an idea, but not yet the users, scope or estimate you need before committing money.

Timeline: 1-2 weeks

Start with Discovery Sprint

What you get.

The sprint is our usual first step for products: the product discovery phase before an MVP Build or AI work, so the build starts with the idea checked with real users, the problem defined and a build estimate in hand.

  • A clear problem and the users who have it

  • Findings from talking to real users

  • A product plan (PRD) for the first version

  • A clickable prototype to show people

  • A build estimate, ready for a written scope

How it runs.

The full process
  1. Kickoff call

    We agree the problem to solve, who it is for and what a good result looks like.

  2. User research

    We talk to the people who will use the product, before deciding what to build.

  3. Product plan and prototype

    We write the product requirements document (PRD) and build a prototype you can react to.

  4. Build estimate

    You get an estimate for the build, ready to turn into a written scope.

Who it is for.

Good fit
Founders and teams with an idea for an MVP or an AI feature, before they commit to a build.
Not a fit if
  • You already have a written scope and only need it built.
  • You need a large team from day one.

Who builds it.

  • Portrait of Aditya Gangwani

    Aditya Gangwani

    Product lead

    Leads the sprint: the user research, the product plan and the scope.

  • Portrait of Vansh Arora

    Vansh Arora

    Technical lead

    Builds the prototype and checks the build estimate.

What happens next.

Start with Discovery Sprint
  1. Aditya replies within one working day
  2. A call about the problem
  3. A written proposal

Common questions

A product discovery sprint is one to two weeks of focused work before you build: we define the problem, talk to real users and scope the first version. You leave with a product plan (PRD), a clickable prototype and a build estimate, ready to turn into a fixed scope for an MVP or AI build.

One to two weeks. One week suits a narrow idea with users who are easy to reach. Two weeks suits an AI feature or a product with more than one type of user. The length is agreed in writing at kickoff, and the sprint ends with the build estimate either way.

A fixed scope and an honest estimate need groundwork: the problem, the users and what a first version must do. The sprint does that in one to two weeks, and it usually leads into an MVP Build or AI work. Websites and retainers can start without it.

A kickoff call to agree the problem, conversations with real users, then a product requirements document (PRD) and a clickable prototype of the core flow, and finally a build estimate. Aditya leads the research and the plan; Vansh builds the prototype and checks the estimate.

A problem definition, notes from user research, a product requirements document (PRD), a prototype and a build estimate.

Usually, yes. A fixed scope needs a clear problem, clear users and a build estimate. If you already have those in writing and trust them, we can review them with you instead.

A design sprint tests one solution to a known problem in about five days. A discovery sprint checks the problem and the users first, then scopes a whole first version. A design sprint can sit inside discovery when one flow needs testing.

Yes. For an AI idea, the sprint also writes down what the AI must never do and where a person signs off, so those limits are in the scope from the start.

It usually leads into an MVP Build or AI work. The scope and estimate from the sprint become the starting point for its written scope.